Lead pipe replacement: why are we even bothering?

Rob Lindsay, Jim Marshall, Dave Champness

Research output: Contribution to specialist publicationArticle

Abstract

The Drinking Water Inspectorate’s (DWI) reports for England and Wales critically observe that if the rate of lead pipe replacement in the agreed AMP8 undertakings are maintained in future AMP periods South West and Bournemouth will be first to achieve a ‘lead free’ status by 2078. However, it will be 1,300 years later before the areas supplied by Northumbrian Essex and Suffolk Water achieve the same status.
Original languageEnglish
Pages58-69
Number of pages2
VolumeAutumn 2024
No.223
Specialist publicationInstitute of Water. Journal
PublisherJimJam Media Ltd
Publication statusPublished - 2024

Keywords

  • lead
  • drinking water
  • corrosion
  • leaching

Fingerprint

Dive into the research topics of 'Lead pipe replacement: why are we even bothering?'. Together they form a unique fingerprint.

Cite this